首页 > 文章中心 > 分包管理措施

分包管理措施

前言:想要写出一篇令人眼前一亮的文章吗?我们特意为您整理了5篇分包管理措施范文,相信会为您的写作带来帮助,发现更多的写作思路和灵感。

分包管理措施

分包管理措施范文第1篇

关键词:分包管理;问题;对策

Abstract: our country most of the construction task in the construction engineering project management is the construction general contracting company will service team and own used machinery and equipment, supplied materials are organized. Low degree of specialization, service quality is not stable, general contracting to spend a lot of manpower and resources to service team management, contractor management level has also been, not improve. Along with the construction market competition is intense, so contract management is quite important, but in the subcontract management in the process of implementation also appeared some problems, this article made a simple discussion on these questions and measures is given.

Key words: the subcontract management; The problem; countermeasures

中图分类号:TL372+.3文献标识码:A文章编号:2095-2104(2013)

1、实践中分包管理常见问题

1.1分包商工程质量不佳

(1)、分包商材料方面质量问题,以次充好。这一点,无论分包商信誉好坏,均有可能出现。因为分包商在本专业上有信息优势,技术价格知识较非专业人员丰富,在投标竞争中,得标价已很低的情况下,为了获取最大利润,最佳选择就是以次充好,鱼目混珠,材料性能上相近,但品质价格上相差很远,这样做既隐秘又安全。如防水涂料,油性的和水性的,结果相近,但价格相差很大;如铝合金门窗,同样的样式,但材料壁厚或合金品质不同,价格悬殊很大;如钢筋可能检验实验结果均合格,但出产厂家的不同,其质量和价格也相差很大,焊接上就会出问题;如水泥可能实验结果也合格,但旋窑和立窑水泥的稳定性和价格就会有很大差别;如胶合板几乎相同的板材,但执行新标准(环保)的和执行旧标准的价格就差别悬殊。材料问题可能使总包方付出了成本,埋下隐患,质量风险还要承担。材料质量问题很普遍、很隐秘、也很敏感,比较施工质量问题在价值上的损失更大。对策:合同中详细指明材料品质、品牌、性能参数等,现场严把材料关,总包方应深入了解相关材料技术知识和市场信息,提高业务能力,赌住分包商的空子。

(2)、施工质量问题,不符技术规范。这种问题较表面化,容易引起重视。此问题各种研究非常多,此处省略。处理对策:动态检查,研究质量缺陷、分析原因,指定改进计划,实施和敦促承包商改进。

1.2分包商现场管理人员和技术工人素质不高由于部分分包商从事简单工作,人员素质不高,影响工程质量或进度。对策:合同询价阶段注意考察分包商施工技术能力、人员素质;施工前,采用样板工程的方法,实际考察,防止低劣素质人员进入;总包方要坚决督促分包商采取措施增加投入,更换或培训或改善现场人员;必要时总包方也可直接介入,安排专人专项管理,以总包方的技术能力支持分包商,弥补分包商的能力不足情况。

1.3分包商工期拖延工期拖延的原因很多,一般来说,双方都有原因:总包可能整体计划缺陷,工作面没有创造出来,协调不够;分包方可能人力物力投入不足,人员、机械周转不及,管理不善。对策:总包应先加强现场实际进度的检查监控,缩小进度更新周期;了解实际的情况制定计划;根据实际情况,制定赶工措施,包括激励和惩罚措施;充分沟通,谋取业主和相关各方的理解支持。此问题各种研究非常多,此处略。可查阅相关资料。

1.4分包商只顾自身施工管理,忽略项目整体系统性这是分包管理常见问题,处于节约成本,保护自己,分包商总是专注于个体的施工管理的,并且总是内敛的。主要表现在:文明施工逃避责任,可能是别人造成的,不管;生产质量推卸责任,别人污染的缺陷,不修;工具和材料、工作面独占使用,宁可作废决不予人。这种局面给项目的管理造成很的困难,总包管理人员往往主要是协调这些东不沾边西不靠的事情,而且由于相互推委,往往不能很好解决,不仅增加项目成本,而且降低项目整体效率。对策:如前所述,在合同中要求分包商有协调配合义务。现场管理要通过日常协调事件的处理,采用奖励惩罚等激励手段,强化分包商主动配合总包商管理的行为,弱化分包商内敛行为。教育分包商树立项目整体的系统观念。

1.5总包商逃避自身义务一般来说,总包商由于自身的地位优势,较容易逃避义务,总包方逃避义务,一定是在分包逃不掉的,能逼使分包方接受的情况下发生。所以对分包商来说,总包逃避义务,则一定面临损失。对策:分包商应经常的提醒总包商:必须履行合同义务,否则将对项目造成危害。区别的对待具体事件,具体问题具体分析:如果总包逃避义务,我将面临损失,如不接受,将有更大损失,则考虑接受;如接受与不接受,其损失相当,则考虑不接受,同时要有同期记录的观念,以便作为日后谈判的条件。

2、对未来建筑工程项目分包管理的探讨

2.1、专业化程度更高专业化程度更高,使总包向管理方向分化,分包商则向专业施工更精分化。总包对分包的依赖度要增加,更多的具体施工任务要寻找分包商来完成;分包商将专注于其专业核心竞争力,分包商的一些不重要的辅工作将会外包,由更专业的分包商来完成。

2.2、组织更灵活,组织界限将模糊,总包项目团队也将出现分化,总分包将更多的以针对任务的临时性团队组合(任务小组)来完成工作。项目组织将会更趋灵活的组建,分包商会更多的参与总包的项目团队工作,合同的联系使各方更趋于平等合作的关系。项目会有更多的补充协议。

2.3、管理将更规范化合同管理的地位将更重要,项目正式信息沟通会更规范,工作程序会更加规范和严格。

2.4、分包商授权度更高分包商权力会增大,总包商会更趋向于向业主提供更周到的服务。对分包商的授权会增大,更多的具体施工由分包商完成,善于自我管理的分包商更受欢迎,分包商将趋于更多的自我管理。

3、结语

以上是本人在从事建筑工程项目管理工作中,由自己经验和知识积累,提出的对分包管理的模式的一些看法。由于市场竞争的加剧,建筑工程项目业主也变得更加专业化,质量和服务水平的要求越来越高,对任何建筑企业都有增强竞争力、降低成本、提高利润的需求,专业化的趋势不可避免,企业不会是大而全了,而是精而强了。这种趋势将使企业压缩规模,专注于提升核心竞争力,将更多使用外包的形式,利用更有效率的资源。现代项目管理有着很强的整合能力,对完成有外包参与的任务有着很强的管理能力。如何在项目管理中做好分包形式的管理工作呢?相信这样的问题并不仅仅是建筑领域,也是其他行业所共同面临的问题。本文提出的“采用集权式的公司发包,授权项目的管理实施,采取矩阵式的组织管理结构,着重于合同管理和生产过程目标管理的方式”,只是分包管理的一种方式,只是提出一种供借鉴的办法。在实际工作中,怎样管理,应该在学习借鉴的基础上,采用“实事求是”的态度,创造性的发挥。

【参考文献】

[1]、徐蓉,工程建设总承包管理,北京:北京科学技术出版社,2005

分包管理措施范文第2篇

关键词:劳务分包结算管理措施

中图分类号:C93文献标识码: A

1、引言

随着建筑业飞速的发展,建筑劳务市场也有了长足的发展,总结当前劳务分包的特点,主要分为三类:清包工、扩大劳务分包与综合扩大劳务分包,以下就三种分包不同承包方式、结算形式、现场管理中容易存在的问题,及相应的管理措施进行分条说明。

2、分包内容与特点

2.1、单纯劳务分包:即通常所说的清包工,指劳务队伍只提供劳动力作业,对施工所用的小材料及中小型工具均由总包提供(工人的手用工具如锤子、锯等除外),通常此类型劳务队伍规模较小,缺少施工资质,施工中承包的范围也较小,一般只做一个单项,如模板、钢筋等。

2.2、扩大劳务分包:工程发包单位为总包方,承包方为劳务公司,承包的内容较清包工面广,除提供劳务作业外,包括部分小型耗材如:绑扎丝、钢筋垫块、脱模剂、密封条等,以及小型的施工机械,如钢筋切断机、弯曲机、调直机、木工电锯、三级配电箱等。工程主体、装修材料及中大型机械均由总包方提供,此类型分包方式是当前主要的、最常见一种,劳务公司一般有资质,承包的范围也较广,可以做建筑主体结构、二次结构、精装修等。

2.3、综合扩大劳务分包:相比前两种此承包面更广,内容也最多,主要包括施工劳务、耗材、部分施工材料、施工机械等。耗材包括铁丝、垫块、脱模剂、模板、木方、钢管、安全网等,施工材料可以包括砖、砂石、水泥(主要用于二次结构)、网格布等(注:施工材料均需由总包方指定或监控)、施工机械有钢筋切断机、搅拌机、弯曲机、个别可以包含塔吊等大型机械等。此种分包模式,在市场中较常见,一般在中大型的总承包企业采用,分包单位一般为有一定资质的劳务公司或总承包公司,承包的范围也最为广泛,房建、市政、路桥等行业均有,专业范围更广可以做主体、装修、精装修等。

3、不同分包模式的计量结算情况

3.1清包工主要是人工费一项,费用范围较单一,计价方式一般有如下几种:

a、综合工日计算法:按图纸工程量套相应地区的预算定额,计算施工项目的相应综合工日乘以约定的工日费用单价,所得为劳务费用,再由劳务分包方对内部工人进行结算,与施工工人的结算一般由总包方进行监管。此法双方结算时计算工程量比较烦琐,双方定额项目选择稍有不同则计算的结果就出现偏差从而产生争执,整个结算过程也较长,对于完工后想尽快结算的发承包双方都比较麻烦,故此计价法05年以前使用较多,在近年很少采用了。

b、单价法:在签订分包合同时,发承包双方根据工程实际情况,双方按不同分部的分项工程(如:钢筋、模板、混凝土、砌筑等,基础、主体、二次结构等不同分部),分别商谈一个单价清单,在中间计价或最终结算时,按工程量计算规则算出工程量,再按单价清单套出最终工程款。此类结算方式是现阶段清包工承包方式最常用的一种计价方式,特点是结算方便,按计算规则进行工程量计算,争议较少,单价清单在签订合同时一块签订,不存在异议,最终结算便捷;对总包单位,工程量一般在施工前均进行初步计算,价格确定后,可以很方便计算出工程直接成本,便于成本控制及施工管理。

c、建筑面积法:分包单位在投标时按照工程图纸初步计算所承包的项目需要的费用,折算到每平米建筑面积中的价格,进行竟标,中标后按平米单价与总包方签定分包合同,施工中间计价及最终结算时按施工的建筑面积进行计算费用,此类计价方式,最便捷,可快速结算,缺点是:投标时一般时间都较紧,对费用的核算不准确,易漏算或错算,存在一定的风险,对总包方的成本控制要求较高。此类计算法的便捷性,在当前市场中有相当的施工企业采用。

3.2扩大劳务分包计价方式:

扩大劳务分包的费用组成主要人工费、耗材费、小型机械费、税费(按约定),费用计算较清包工复杂,计价的方式主要有如下两种。

a、单价法:总分包在签订合同时双方合同约定,按不同的单项工程商定不同的单价,单价中可以含人工费、材料费、机械费,也可把材料费、机械费单独列项,汇总后按建筑面积进行计价,(一般房建工程,耗材费及小型机械费一般为10元/m2左右),工程结算时按国家规定的计算规则算出工程量,再结合单价算出工程费用,此类计价方式按项进行计算,计算较详细,工程量计算按国家规则执行,不存在争议,对分包方而言,按工程量进行结算,所承担的费用风险较小,总包方对成本管理方面,需要在施工前对工程量有基本准确的计算结果,以方便施工成本的控制与管理,由于其计价的特点,该分包计价方式在当前采用较多。

b、建筑面积法:与清包工的计算方式基本相同,只是其中平米单价中添加了耗材及小型机械费用,最终结算时按规则计算出建筑面积乘以单价即为分包价格。此类计算法的便捷性但对发承包双方均存在投标时工程量计算不准风险,在当前市场中有相当的施工企业采用。

3.3综合扩大劳务分包计价方式:

综合扩大劳务分包的费用组成主要人工费、材料费、机械费等,费用项目较多,计算较复杂,计价的方式主要有如下两种:预算定额法、清单计价法两种。

a、预算定额法:费用结算主要按预先商定的地方定额及当地的材料调差及人工调价后进行结算,由于该方法的计算需考虑措施费、材料调差及各种取费等,所计取的项目较多,结算烦杂,用时较长,故当前采用较少。

b、清单计价法:总分包在签订分包合同时可按总包提供的清单进行报价,按分项工程将人工费、材料费、机械费及利润汇总后进行统一报价,按中标的价格签订合同,结算时按图纸、清单计价规则进行结算,此种计价法结算相比预算法快捷简便,预定单价、按规则计算工程量,对发承包双方均较方便,故当前综合扩大劳务分包大多采用该方法进行承包。

4、不同分包模式的管理措施

4.1、清包工分包模式的管理

清包工主要提供劳动力,所有材料及施工机具均为总包方提供,这样在施工过程中就易使的清包工人员所关注的只有自已的劳动量,对材料使用的节省与浪费,工器具使用的是否爱惜都不太关心,更有甚者会为节省一点劳动量而浪费材料与损坏工具,所以对清包工的管理应该精细化,细到对单独的班组、工人,主要措施如下:

a、严把进场关,优选高素质的施工队伍;b、制度化管理,对施工现场制订详细的管理制度,按制度进行作业与管理;c、精细化管理,队伍进场后的教育培训、班前会、作业现场、完工后检查,应该每一步都进行明确落实到位,特别是过程检查、完工验收,必须由专业管理人员进行验收,合格后与下一工序办理交接方可通过。

对清包工的管理不仅要求总包方必须面对每一个施工班组,而且对总包方现场管理人员的素质要求也更高,不但要掌握本专业知识,还应学习了解其它专业相关的知识并且能熟练的运用到现场管理中,能在生产过程及时的发现与解决问题,对不合格或浪费的现像及时发现予与改正。现场管理量很大、很烦琐,管理不善就容易造成现场混乱、窝工损失,但是相对于其它两种分包方式,此种价格最低,对于总包方而言利润最高,针对于当前建筑公司一线管理人员匮乏的现象,此种方式为数不多的公司采用,但考虑利润的关系,会有越来越多的公司采用。

4.2、扩大劳务分包模式的管理

扩大劳务分包的费用组成主要人工费、耗材费、小型机械费三种,劳务队伍的管理人员配置也相对齐全,对于总包方而言,既可以把主材、设备的利润拿回,又可以相对减少项目管理人员的配置,利于工程成本的控制,相对于清包工模式利润虽少,但成本的风险相对也减少,因此劳务扩大分包的模式在一定时期内有很大的市场。

扩大劳务承包公司组织小的专业班组进行施工,项目部管理人员对劳务公司的管理人员,再由劳务公司管理人员进行落实,所以在分包队伍的选择上一定要高标准、严要求,分包队伍素质跟不上必然会带来“砸牌子”的风险,管理应注意如下几点:

a、严把队伍选择关;由于直接与施工小班组存在合同关系,现场管理中处于直接管理的地位,所以对管理要求及措施的落实起着至关重要的作用,队伍整体素质要过硬、施工能力强、管理能力过关、信誉度好,这样的队伍在实际生产中方可按总包方的要求进行施工,另外现场管理中总包方与分包方可以进行互补避免问题发生。

b、尽量选择要有一定经济实力的施工队伍,当总包方因甲方或其它原因不能按合同约定及时付款时,在一定时间内扩在分包队伍应有实力保证正常生产。

c、健全管理机构、明确职责、制度化管理,总包方的管理人员主要针对劳务队管理人员,故此进行现场安排、检查时,宜按制度要求进行操作,现场约定及要求应按文件下发,避免分包方过期不认帐。

d、加强过程中总包方的服务职能,计价、付款、 结算等严格按合同要求进行,技术、过程指导、后勤等,给分包队伍提供一个可靠的充满温情的平台,以利于工程的开展。

4.3、综合扩大劳务分包管理

综合扩大劳务分包模式, 分包方承包的范围广更广,分包的管理机构也更完善,承担的风险也更大,总包方变相的将不可预见风险转移了一部分给分包,对此种模式的分包管理个人总结出以下几点:

a、建立健全管理机构,明确职责:从事分包管理工作需掌握经济、法律、技术等多方面的知识,其涉及面之广、综合性之强,设立专门机构实施管理变得非常必要,应该合理地设置管理机构并实施有效地管理。机构设置应从公司层面开始,明确部门主管分包企业的审批及工程施工过程中的工程分包工作,并协调公司各相关部门参与管理,并加强信息沟通,其他相关部室及项目部按照公司管理办法规定的职责各司其职,各负其责。在各部门的团结协作、相互配合下共同对分包企业实施控制与监督管理

b、严格审核及考核分包企业资质,完善合格分包企业名录:综合扩大分包企业选择的好坏, 直接影响到整个工程,因此选择具有相应资质并具备丰富施工经验的分包来完成施工任务是工程的关键因素之一。在选择时就做好如下几点:①审查企业营业执照、资质、安全资格等证书,确定分包企业有能力从事该工作,另外,还应审查分包方的项目经理是否属于该企业,杜绝挂靠承包。②审查分包企业人员素质、机械设备、资产状况,以此判断履约能力。③调查分包企业以前的业绩,了解其生产能力及以前的履约情况。④建立合格分包方档案。

c、加强过程控制,进行全面、有效的监督管理:合同签订后,项目部组织分包方开工,在施工过程中,对分包的现场环境、文明施工、质量、安全进行全面的监督管理,加强现场的监督检查,发现问题及时要求分包方按整改意见进行整改,工程结束后项目部对分包方进行考核,反馈到公司记录到档案,以便后序工程考核使用。

5、劳务分包市场的改进与展望

多元化的分包管理的模式正在逐步走向正轨,针对以前工程中发现的问题与不足,今后还应加强如下几项工作:

a、进一步加强与规范分包现场管理:项目部要进一步完善对分包的现场管理,加强培训教育及过程控制,使其规范化、秩序化。

b、加大在施工过程中的考核奖罚力度:将监督考核作为一种强制性的管理措施,制定切实可行的考核标准,做到有理有据、公正、客观进行,按考核结果进行相应奖罚。

c、强化合同的约束作用,总分包间的合同应公司及项目部各部门共同参与审核,加强成本的管理,明确总分包双方的责任、权利、义务,按合同约定管理。

d、督促加强分包企业的自我管理水平,随着分包企业的发展,分包企业也将趋向于更加完善的自我管理,自身内部也对所属人员实施有效、全面的管理,努力提高综合素质,以适应当前市场的需要。

e、总承包、勘察设计、监理、政府部门等应为分包企业提供一个培训学习的良好平台,做好对劳务人员的技能培训和能力考评,并督促分包企业加强员工的培训工作,为劳务企业的成长营造一个良好的环境。

分包管理措施范文第3篇

关键词:水土保持; 水土保持方案编制; 意义

Abstract: soil and water conservation is to point to preventing soil and water loss, protection, improvement and rational use in a mountainous, hilly and sandy soil and water resources, maintain and improve land productivity, to make full use of water and soil resources economic and social benefits, and establish a good ecological environment comprehensive science and technology. According to the requirements of the soil and water BaoChiFa in China based on the present situation of soil and water conservation, the preparation of soil and water conservation scheme is of great significance.

Key Words: soil and water conservation; the water and soil conservation programme establishment; significance

中图分类号:S157 文献标识码:A 文章编号:

1 水土保持和我国水土保持的现状

水土保持是指防治水土流失、保护、改良与合理利用山区、丘陵区和风沙区水土资源,维护和提高土地生产力,以利于充分发挥水土资源的经济效益和社会效益,建立良好生态环境的综合性科学技术。目前水土保持由三大类措施组成: 水土保持农业技术措施、水土保持林草措施和水土保持工程措施各类措施。特别是工程措施与林草措施之间,始终存在着互相依赖,相辅相成的关系。水土保持工作对发展山区、丘陵区和风沙区的生产和建设,整治国土、治理江河、减少干旱和风沙灾害等方面都具有重要意义。

我国人口众多,可开发利用的土地资源有限,能够耕种的土地更为珍贵。每年仅因土壤退化就要损失耕466000 ~ 533000万km2,因自然灾害而丧失耕地约100000万 km2耕地面积在减少,每年人口却增加1400 万人,如这两个逆向增长继续下去,我国的人地矛盾将更加突出。由于水土流失与土壤退化日趋严重,生物生存空间日益缩小,严重威胁着中化民族的生存和发展。因此,正确认识水土保持的重要性,合理开发利用与保护土地与土壤资源, 缓解人地矛盾,发展农林牧业生产,具有特别重要的意义。

“民以食为天,有土则有粮”,拥有丰富的水土资源是立国富民的基础。如果水土资源遭到破坏,进而衰竭,将危及国家和民族的生存。这个结论在世界历史的发展进程中得到了证明:古罗马帝国、古巴比伦王国的衰亡,水土流失导致生态环境恶化致使民不聊生是其亡国的重要原因之一; 希腊人、小亚细亚人为了取得耕地而毁林开荒,造成严重的水土流失, 使茂密的森林地带变成荒无人烟的不毛之地。因此,为了民族的生存、人民的幸福和社会主义祖国的繁荣昌盛,全社会每个成员都应十分珍惜、保护和合理利用水土资源,防止人为造成新的水土流失,竭力做好水土保持工作。

水土流失已成为我国的头号环境问题。从历史和战略的高度,深刻阐明了治理水土流失、建设生态家业的重要性和紧迫性,提出了明确的策略和奋斗目标 目前,国家已全面启动了跨世纪生态环境建设工程,水土保持已成为我国生态环境建设的主体。

2 水土保持方案编制及原因

水土保持方案是指依据我国水土保持法的有关规定,开发建设单位为了防止水土流失, 开展水土保持工作而制定的贯穿于整个工程项目的重要的法律文件。它的内容主要包括扰动土地的整治率,水土流失的控制率,土壤流失的控制率,植被恢复系数以及林草的覆盖率等具体内容水土保持方案的编制, 是我们面临的严峻的环境形势的要求, 是保持水土的必须, 是人与自然和谐发展的重要举措。通过工程水土保持方案的编制和相应的水土保持防治措施的有效实施,将工程建设期的水土流失及危害程度尽可能地减小到最低程度,并有效地促进治理原有水土流失、恢复、改善和美化工程建设区及周边地区的生态环境,推动当地社会经济发展创造良好条件。通过方案编制为工程建设中的水土保持防治管理提供科学依据,从而增强建设单位,施工单位及周边群众的水土保持意识,为水土保持监督执行机构提供监督执法依据。对促进水土保持生态环境监督管理规范化建设,加快水土保持生态建设,推动社会经济建设,实现山川绿化有着极其重要的意义。水是生命之源,土是生存之本,水土是人类赖以生存和发展的基本条件,是不可替代的基础资源。而土壤基本上是一种不可再生的自然资源,因为在自然条件下,生成 1cm 厚的土层平均需要120 ~ 400 年的时间; 而在水土流失严重地区,每年流失的土层厚度均在 1cm 以上。因此,水土流失问题已引起了世界各国的普遍关注,联合国也将水土流失列为全球三大环境问题之一。进行水土保持方案编制是有效防止水土流失的方法之一,起到工程建设前期预防的作用,我国相关条例对此做出了明确的说明,提供了具体的技术标准。

3 水土保持的意义

3. 1 社会生态意义

把水土保持生态环境建设作为基础工程来抓,它不仅关系到我国农业的发展。农民的富裕、农村的繁荣,而且关系到整个社会。经济的持续协调发展,不仅关系到当代人的生产与生活,而且关系到子孙后代的生存和幸福,实施可持续发展战略,是保护中华民族生存空间的伟大工作,是中华民族历史上的一大壮举,也将是对世界文明的一大贡献。就黄土高原来看,黄土高原和黄河的水土流失,正是由于黄土高原源源不断的提供易于流动的黄土资源, 以及黄河常年累月的流水相互作用,从而日益加剧的。也正是这两者的共同作用,共同衍生了黄河文明。为了人类文明的可持续性发展,黄土高原和黄河流域的水土保持不仅关系到人们的切身利益、正常生活,而且关系到整个华夏文明的最根本发展。因此,黄土高原和黄河流域水土保持,对整个人类的未来起到决定性的关键作用。可见,深刻贯彻和研究水土保持, 采取科学的手段,从常规的方法中释放,不断创新,提出各种可能行之有效的办法,全方面结合, 编制出科学的水土保持方案, 才能将黄土高原和黄河流域的水土保持问题彻底解决, 从而有利于民族和社会的可持续性发展和和谐发展。依法进行水土保持方案编制具有深远的社会意义和生态意义!

结语:进行水土保持方案编制是保持水土的必须,是人与自然和谐发展的重要举措,也是落实我国水土保持法的实际内容,是水土保持法顺利实施的重要途径,体现了我国大力加强水土保持的决心,体现依法治国的基本国策,有重大的法律意义。水土保持方案编制是我国在环境资源实践经验的总结,是我国环境保护中一项非常重要的的法律制度。是贯彻预防为主原则,防止新的生态破坏产生的有效措施,是加强建设项目环境资源管理的基本制度,体现了我国环境法的基本精神,对我国以后水土保持工作的法律实践有着深远的意义。

参考文献:

[ 1] 中华人民共和国水土保持法( 1991 年 6 月 29 日)[Z].

分包管理措施范文第4篇

【关键词】:外墙保温;施工技术;管理;质量控制;措施

中图分类号:TU111.4+1文献标识码: A 文章编号:

引言

建筑外墙保温技术是建筑工程施工中应用的一种相对比较新型的、建筑节能环保施工技术与方法,它对于建筑工程的结构功能与工程施工质量都有着很大的影响和作用。建筑外墙保温技术在进行建筑工程的施工应用中,主要是通过使用一种固定的粘结与机械锚固粘贴,或者是机械锚固与喷涂浇筑的方式,进行建筑外墙的保温施工应用,从而使建筑工程的外墙结构部分达到一种保温以及隔热的效果作用。在进行建筑外墙的保温施工过程中,建筑外墙保温施工技术的选择与施工应用情况,对于建筑外墙的保温与隔热施工效果有着很显著的作用影响,而且对于建筑工程使用过程中的节能与环保效果也有着很大的影响。

一、建筑外墙保温施工技术概述

建筑外墙施工中使用的外墙保温施工技术,是一种通过使用固定的粘结与机械锚固粘贴或者是机械锚固与喷涂浇筑的施工方式,将一些建筑外墙保温施工应用的绝热材料等,与建筑结构的外墙墙体进行固定连接成为一体,以此提高建筑外墙结构部分的保温功能与效果,实现建筑外墙的保温与隔热功能的技术手段与方法。建筑外墙保温施工技术既可以在新建建筑工程施工项目的墙体结构中,进行施工应用,也可以在一些建筑改造工程的外墙改造施工中进行应用实现。随着我国社会经济发展中,节能环保发展要求提出,建筑外墙保温施工技术在我国建筑工程施工中的应用也越来越广泛,这对于我国建筑施工建设技术水平提升与建筑事业的发展进步都有着积极的作用和意义。

二、建筑外墙保温施工的主要技术方法分析

根据目前我国建筑工程的施工建设情况,在建筑外墙施工应用的保温施工技术与方法,主要有外挂式建筑外墙保温施工技术、保温夹层建筑外墙施工方法、聚苯板与建筑墙体一次性浇筑成型的外墙保温施工技术、聚苯颗粒保温浆料建筑外墙保温施工技术等,这些都是建筑外墙保温施工中比较常用的技术方法,在施工应用过程中,具有各自的应用特征与优势,并且对于建筑外墙结构的保温隔热功能效果也比较突出。

1、外挂式建筑外墙保温施工技术

外挂式建筑外墙保温施工技术,就是指通过使用粘接砂浆材料,或者是建筑外墙保温施工中专用的固定件等,将建筑外墙保温施工应用的材料贴挂在外墙墙体上,在通过在建筑外墙墙体上进行抗裂砂浆的涂抹,并在涂抹施工中使用玻璃纤维网格布作为建筑外墙保温的保护层,进行建筑外墙保温施工的一种技术手段与方法。需要注意的是,在通过上述方式进行建筑外墙保温施工完成后,最后再进行建筑外墙装饰面的安装施工实施。使用外挂式建筑外墙保温施工技术进行建筑外墙的施工过程中,主要应用的外墙保温施工材料有岩矿棉以及玻璃棉毡、聚苯板、钢丝网架结构的夹芯墙板等,其中,由于聚苯板材料本身的物理性能优势突出,并且在建筑外墙保温施工中的价格成本比较低,在建筑外墙保温施工中的应用相对普遍并且广泛。

2、保温夹层建筑外墙保温施工方法

保温夹层的建筑工程外墙保温施工方法,主要是指通过将建筑工程的外墙墙体作为夹层的结构形式,并在建筑外墙夹层中进行珍珠岩以及木屑、矿棉、玻璃棉、聚苯板等材料的填充,以此形成建筑外墙结构的保温层,实现建筑外墙的保温与隔热功能效果。应用保温夹层建筑外墙保温施工技术,进行建筑工程的外墙保温施工中,该技术方法不仅对于建筑工程的主体结构主要保护功能和作用能够延长建筑工程的使用寿命,并且还可以消除建筑外墙结构中的热桥效应,具有较好的外墙保温与隔热功能作用。

3、聚苯板与建筑墙体一次性浇筑成型的保温技术

在进行建筑外墙的保温施工中,使用聚苯板与建筑外墙墙体一次性浇筑成型的外墙保温施工技术,进行建筑外墙保温施工应用,主要就是指在进行建筑工程的外墙结构部分施工时,在建筑外墙结构的混凝土框一剪体系内,吧聚苯板材料放置在建筑外墙结构的施工模板内,然后在建筑外墙的墙体外侧,将聚苯板材料与建筑墙体进行一次性的浇筑施工成型,成为一个复合结构的建筑外墙墙体。在进行建筑外墙保温施工应用中,与建筑墙体进行浇筑使用的聚苯板材料,可以是单面钢丝网结构的聚苯板,也可以是双面钢丝网结构的聚苯板。使用该技术进行建筑外墙保温的施工应用,不仅对于外挂式建筑外墙保温施工中的局限问题有了很好的改善与解决,并且建筑外墙施工效率高、工期短,保温效果较好,建筑外墙施工安全也有保障。

4、聚苯颗粒保温砂浆外墙保温施工方法

在进行建筑外墙保温施工中,应用的聚苯颗粒保温料浆外墙保温施工方法,主要是使用废弃的聚苯乙烯塑料,进行固定大小颗粒的加工实现,然后与建筑外墙的保温砂浆材料混在一起,进行建筑外墙保温的施工应用。使用聚苯颗粒保温砂浆施工技术,进行建筑外墙的保温施工,不仅具有较好的建筑外墙保温效果,而且具有较好的建筑外墙抗裂缝与防渗漏效果,在建筑外墙保温施工中也具有一定的应用范围。

三、控制外墙保温工程质量的措施

1、控制裂缝的技术措施

墙体保温工程是一个多层有机复合体。通常由界面层、保温隔热层、抗裂防护层、饰面层等组成,彼此协调形成一个有机系统。实践证明,欲保证墙体保温工程的质量,必须通过多层复合材料来共同实现。因此,就抗裂性能来说,除应考虑各层材料自身变形能力外,还应充分考虑材料的相容性及匹配性。墙体保温工程中抗裂防护层材料的性能主要涉及:抹面砂浆抗裂性,保温隔热层的粘结强度、耐老化性能,加强网的抗拉强度、拉伸伸长量和耐碱性,以及饰面层(包括腻子层)的变形能力以及相容性等。

2、控制耐久性的技术措施

外保温层在实际使用中会受到相当大的热应力作用,这种热应力主要集中作用在保温系统的保护层上。保护层温度在夏季可高达80℃,突降暴雨所引起的表面温度变化可达50℃。同时夏季高温还会加速保护层的老化,部分有机粘结材料会由于紫外线辐射、空气中的氧气和水分的作用而遭到破坏。这就要求其能够经受住周期性热湿和热冷气候条件的长期作用耐候性试验模拟夏季墙面经高温防晒后突降暴雨和冬季昼夜温差的反复作用。是对大尺寸外保温墙体进行的加速气候老化试验,与实际工程有着很好的相关性。

3、外墙保温系统的防火安全性技术措施

为弥补目前国内聚苯板及其它有机保温材料外保温系统抗火灾能力差、高温环境下易消解的隐患,在高层建筑中应尽量避免使用有机保温材料,最好的办法是选用无机保温材料系统,如岩棉板外墙保温系统或采用防火等级比较高的胶粉聚苯颗粒保温系统。若确需采用有机保温材料系统时,应在有机保温材料面层抹至少10mm厚的胶粉聚苯颗粒防火浆料,以提高整个保温系统的防火等级。大型火灾模拟试验证实,这种做法是十分可靠的,可有效延缓大火对有机保温材料的破坏。

结束语

总之,建筑外墙保温施工技术在建筑工程施工应用中,不仅对于建筑外墙结构具有一定的保温与隔热功能效果,而且也是一种节能环保的建筑施工技术与方法,具有突出的施工应用价值,在进行建筑施工应用中,应注意结合建筑工程施工的实际情况,选择合适的外墙保温施工技术方法,以保证建筑工程的结构功能与施工质量。

参考文献:

分包管理措施范文第5篇

关键词:工程;施工管理;质量;措施

建设工程施工质量控制是工程质量管理的一部分,质量控制是在明确的质量方针和目标指导下,通过对具体作业技术和管理活动的计划和实施过程,致力于实现预期的质量目标,是一种过程性、纠正性和把关性的质量控制。只有严格对建设工程施工全过程进行质量控制,包括建立和运行施工质量保证体系,采取施工质量预控,实施施工过程质量控制和严把施工质量验收,才能实现建设工程施工的质量目标。下面笔者从具体施工作业技术层面,浅谈建筑施工管理中分项工程的质量保证措施,抛砖引玉,希望读者不吝赐教。

1 钢筋工程

钢筋料表要经过技术主管复核无误后方可下料加工。钢筋的构造节点做法要满足图纸要求和规范的构造做法。

钢筋搭接接头的位置、搭接长度、锚固长度、钢筋直径间距、保护层厚度等要严格按照设计图纸施工。

大直径的钢筋接头,主要采用墩粗直螺纹接头和电渣压力焊,操作时必须选派专业技术人员现场指导、监督,接头要按照规定抽样试验合格方可进行下一道工序的施工。

2 模板工程

投入大钢模板,螺栓间距等要经过计算确定,防止砼涨模及其他质量通病,达到清水混凝土的目标。改进支模工艺,保证梁柱接头的砼质量,消除砼质量通病。

3 砼工程

对钢筋密集的梁柱接头部位要采用插钢管,用细振捣棒,留设振捣孔等措施来保证砼振捣质量。加强成型砼的养护,强化养护是砼强度增长的必需条件。设专人负责坚持按规范要求进行养护。按规定留设同条件养护试块和标准养护试块,以同条件试块的强度来确定拆模时间。砼供应必须保证连续性,楼面砼浇灌时,要根据泵送能力,严格控制浇注宽度,防止砼出现冷缝。

4 砌筑工程

砌筑前按图放线,构造柱、门窗洞口留设必须准确,门窗洞口按规定埋设防腐木砖、设置过梁,当过梁与圈梁等高时,可用圈梁代替过梁,但钢筋取两者中较大者;砌筑过程中砂浆计量要准确,做到工完料尽,严禁使用隔夜砂浆。

5 装饰工程

建议推行样板制,凡装修项目均要先做样板块、墙,经设计、业主和监理公司认可后在大面积施工。抹灰工程要由上而下,按先平顶,后墙的施工顺序进行,抹灰前应首先进行基层清理,浇水湿润墙面,并在砼表面涂刷界面剂。根据墙体平整度、垂直度找方,抹灰饼,找规矩。内外设计为贴面的按照块料模数,要予留面层做法厚度。 楼地面水泥砂浆工程施工,必须严格按照工序执行,施工前必须将基层水泥渣等杂质清理 ,且基层要充分湿润,扫浆,防止出现空鼓,开裂,起砂等现象,地面完成后,养护期间不得上人,养护至少7天以上。

6 屋面工程

屋面工程必须严格执行“三检”制度,在进入下一道工序前,上一道工序必须办完隐闭验收手续;防水工程闭水试验完成验收合格后,方可进行隐蔽报验。油漆工程施工前确保基底干燥、清洁,涂抹腻子坚实牢固,不得有起皮、裂缝等缺陷,漆膜干燥前保证房间清洁。

7 门窗工程

门窗的规格、型号应符合设计要求,五金配件配套齐全,并具有产品出厂合格证。 结构质量经验收合格,方可进行门窗工程施工,各工种之间办好交接手续。确定统一的窗台标高,确保同一层内窗台标高无误差。确定墙厚方向安装位置,保证同一房间内窗台板宽度一致。门窗固定牢固,门窗装入洞口应横平竖直。

8 设备安装工程

工程设备安装一般主要包括:电梯安装工程,给排水安装消防工程,电气(力)安装工程,通风空调系统工程。

8.1 电梯安装工程:

认真核对电梯安装图纸,按设计要求做好预留、预埋。主体结构施工中,严格控制电梯井的偏差,保证井洞几何尺寸准确。协调电梯安装与其他工种的关系,保证电梯安装质量。

8.2 给排水消防工程:

管材管件及阀门等材料,在安装前先检查和试验,合格后再进行使用。注重管道的焊接、丝接、粘接的质量,严格把关。

管道的法兰连接、法兰阀门的连接,法兰端面及垫板要清理干净,保证接触良好。各种管道安装完成后及时固定、采取强有力的保护措施,防止因外力造成损坏。

8.3 电气(力)安装工程:

钢管预埋前,认真核对专业施工图,按最近距离敷设,敷设在主体结构中的钢管,口要封补好;安装在主体钢筋中的预埋箱在钢筋绑扎时将箱壳预埋好,(或备用木质箱)。采用丝扣连接的钢管要焊跨接地线。穿入管内导线,不应大于管内直径40%,导线在管内不应有接头。

变压器安装前应进行油位有无漏油的检查;安装时注意各方位的用力要均匀。高压开关位置准确,操作方便,使用的配件均为镀锌制品。

8.4 通风空调系统工程:

风管平面不平,造成安装后密封不严。采取措施:法兰材料由专人负责下料,设置焊接模具平台,由技术强的焊工从法兰内侧焊接,不平之处及时打磨,对称,焊接防止焊接变形,焊后及时检查,水平及纵横、弯曲度不合格者及时修整。

系统风量不平衡。采取措施:风管制作在弯管处加合理的风向导流叶片,三通及变径处留有足够的缓冲长度,合理调阀的开启程度,制安时及时检查监督,不合理处及时调整。

9 总结

工程质量好与坏,是一个根本性的问题。工程项目建设,投资大,建成及使用时期长,只有合乎质量标准,才能投入生产和交付使用,发挥投资效益。因此一定要在施工过程中,严把质量关,做好每个分项工程的质量控制,来实现质量管理的目标。